JNNSM Phase 1 plant performance data for November 2013 released by MNRE

MNRE released the performance data for plants under JNNSM for the month of November 2013. As usual, the projects are under 4 different sections. The details of each one is given below.
(Note: Please click on the image to enlarge it)
JNNSM Phase 1 Batch 2
P1 B2
 
JNNSM Phase 1 Batch 1
P1 B1
 
JNNSM Phase 1 Migration
Migration
 
RPSSGP
RPSSGP
 
The data can be downloaded at the MNRE website.
______________________________________________________________________________________________
Subscribe to RESolve Energy Consultants : Perspectives and Insights by Email
______________________________________________________________________________________________