Solar Plant Performance data for May 2014 released by MNRE

As with every other month, the solar plants are under 4 categories – RPSSGP, JNNSM Phase 1- Batch 1, Phase 1 – Batch 2 and Migration projects. The performance data for May 2014 and for the previous months are given below. (Please click on the images to enlarge them).
 
 
JNNSM Phase 1-Batch 1
p1b1
JNNSM Phase 1-Batch 2
p1b2
JNNSM – Migration Projects
p1mig
JNNSM RPSSGP
p1rpssgp______________________________________________________________________________________________

Subscribe to RESolve Energy Consultants : Perspectives and Insights by Email

______________________________________________________________________________________________