Skip to content
Resolve
Search
  • Home
  • About
    • The RESolve Philosophy
    • Team
    • Media Centre
      • Media Presence – International
      • Media Presence – National
    • Advisory Services
      • Solar PV
        • Strategic Advisory
        • Technical Advisory
        • Financial Advisory
        • Policy and Regulatory Assistance
      • Wind Energy
    • Our Success Stories
    • Contact Us
  • Policy Updates
    • Solar Tariffs under various policies
    • JNNSM Updates
      • Solar Parks in India
    • State Solar Updates
    • CERC Benchmark Costs
    • UDAY(Ujwal DISCOM Assurance Yojana) Scheme – Status Updates
  • Capacity Addition Status
    • Solar – Installed Capacity
    • Wind – Installed Capacity
    • Solar Manufacturing Capacity
  • Funding
  • M&A
  • Perspectives and Insights
    • Blog
    • Presentations
    • Subscribe to Newsletter
Resolve
  • Andhra Pradesh Solar
  • Bihar Solar
  • Careers
  • CERC Benchmark Costs
  • Contact Us
  • Financial Advisory
  • Funding
  • Gujarat Solar
  • Home
  • JNNSM Updates
  • Karnataka Solar
  • Kerala Solar
  • Madhya Pradesh Solar
  • Maharashtra Solar
  • media centre
  • Media Centre
  • Mergers and Acquisitions
  • Odisha Solar
  • Our Success Stories
  • Perspectives and Insights
  • Policy and Regulatory Advisory
  • Policy and Regulatory Assistance
  • Punjab Solar
  • Rajasthan Solar
  • Sample Page
  • Services
    • Solar PV
      • Diversification Strategy
      • Diversification Strategy – 2
      • Market Entry – 1
      • Market Entry – 2
      • Market Entry – 3
      • Renewable Energy Sector Analysis
      • Solar Off-grid PV products
      • Solar PV Manufacturing
      • Solar PV Power Projects
    • Wind Energy
  • Solar – Installed Capacity
  • Solar Manufacturing Capacity in India
  • Solar Parks in India
  • Solar Tariffs under various policies
  • Solar Updates in States
  • Strategic Advisory
  • Tamil Nadu Solar
  • Team
  • Technical Advisory
  • The RESolve Philosophy
  • UDAY(Ujwal DISCOM Assurance Yojana) Scheme – Status Updates
  • Uttar Pradesh Solar
  • Wind – Installed Capacity

Covid-19 delayed 63% of India’s planned big solar in first quarter

Solar, Solar PV / By RESolve

Coronavirus-related disruption severely impacted solar installation during the first three months of the year, as the nation added only 689 MW of utility scale PV, against the 1,864 MW that was scheduled to be commissioned.

Read more here.

Post navigation
← Previous Post
Next Post →

Recent Posts

  • Gujarat Solar – Central Government steps in to salvage 700 MW auction
  • India – Renewable energy installation at a five-year low in 2020
  • India reaches all-time high energy consumption in January 2021
  • India’s “Solar-Powered revolution” – IEA Report 2021
  • Can Aatmanirbhar Bharat Abhiyaan help India’s solar manufacturing sector? – ORF

Recent Comments

  • Vishal Gawde on Smart Power Management during islanding condition
  • Saurabh on Solar PV Plant Performance – Capacity Utilisation Factor(CUF) Vs Performance Ratio(PR)
  • letsgetschwifty on Solar PV Plant Performance – Capacity Utilisation Factor(CUF) Vs Performance Ratio(PR)
  • India’s Solar Capacity crosses 32 GW in October 2019 | RESolve Energy Consultants on Renewable Energy Installed Capacity As of 31 March 2013
  • Swami on Smart Power Management during islanding condition

RESolve’s Presentations from Conferences

View more…

Recent Comments

  • Vishal Gawde on Smart Power Management during islanding condition
  • Saurabh on Solar PV Plant Performance – Capacity Utilisation Factor(CUF) Vs Performance Ratio(PR)
  • letsgetschwifty on Solar PV Plant Performance – Capacity Utilisation Factor(CUF) Vs Performance Ratio(PR)
  • India’s Solar Capacity crosses 32 GW in October 2019 | RESolve Energy Consultants on Renewable Energy Installed Capacity As of 31 March 2013
  • Swami on Smart Power Management during islanding condition

Popular posts

  • Solar PV Plant Performance – Capacity Utilisation Factor(CUF) Vs Performance Ratio(PR)
  • Smart Power Management during islanding condition
  • Renewable Energy Installed Capacity As of 31 March 2013
  • Kerala 10,000 Solar PV Rooftop Programme – List of empanelled installers announced
  • Tamil Nadu – Power Tariffs proposes steep electricity tariff hike for bridging revenue gap of Rs. 6,854 Crores

Quick Links

  • Home
  • Careers
  • Contact Us

Copyright © 2023 Resolve | Powered by Astra WordPress Theme