India added 105.7 MW solar capacity during April to July 2014 – MNRE

The latest data released by the MNRE shows that the first 4 months of the Financial year saw only a marginal increase in the solar installed capacity. The total installed capacity stood at 2737.6 MW as of 11 August 2014 as against  2631.9 MW on 31 March 2014. The bulk of the capacity addition came […]

India added 105.7 MW solar capacity during April to July 2014 – MNRE Read More »

No Solar Capacity Addition in April and May 2014 – MNRE

The first two months of the first Quarter of the financial year 2014-15 have been very quite. According to the Ministry of New and Renewable Energy(MNRE), only 130 MW of new grid-connected renewable energy projects were commissioned in India during April and May 2014. Incidentally, all of the capacity added was in the wind sector,

No Solar Capacity Addition in April and May 2014 – MNRE Read More »

India’s Operational PV Manufacturing capacity – 297 MW for cells, 1304 MW for Modules – MNRE

The Ministry of New and Renewable Energy(MNRE) today released the list of 52 PV manufacturers in the country. While the installed cell manufacturing capacity is 1386 MW, the operational capacity is only 297 MW. Similarly, the nameplate PV module manufacturing capacity is 2756 MW, but the operational capacity is less than half of this capacity(1304

India’s Operational PV Manufacturing capacity – 297 MW for cells, 1304 MW for Modules – MNRE Read More »

Rs. 4730 Crores sanctioned for off-grid solar subsidies for the Phase 2 of JNNSM

The MNRE has notified that it has received the President of India’s approval for the continuation of the “Off-grid and decentralised” scheme in the Phase 2 of JNNSM and a total of Rs. 4730 Crores has been allocated for the entire 12th plan period(which coincides with the Phase 2 of the JNNSM). The notification an

Rs. 4730 Crores sanctioned for off-grid solar subsidies for the Phase 2 of JNNSM Read More »

India’s renewable energy capacity increases drastically in Q4 of 2013-14 : MNRE

The Ministry of New and Renewable Energy(MNRE) has released the renewable energy installation capacity as of 31.03.2014, the end of the financial year(FY) 2013-14. Some of the highlights are a. 3.639 GW of grid-connected renewable energy capacity was added in the FY 2013-14. The cumulative RE capacity stood at 31,707 MW at the end of

India’s renewable energy capacity increases drastically in Q4 of 2013-14 : MNRE Read More »

Solar Plant Performance data for March 2014 released by MNRE

After a gap of one month, MNRE has released the performance of plants commissioned under JNNSM for March 2014. The data for February 2014 is not available. As usual, the solar plants are under 4 categories – RPSSGP, JNNSM Phase 1- Batch 1, Phase 1 – Batch 2 and Migration projects. The performance data for

Solar Plant Performance data for March 2014 released by MNRE Read More »

Solar – India adds 453 MW in Q4 of FY 2013-14; Total addition in FY 2013-14 : 948 MW

MNRE today released the total solar installed capacity in the country – the number stood at 2631.9 MW as of 31 March 2013. That represents an increase of 948 MW from the previous financial year(FY). The growth trajectory for the past years can be seen below.  Earlier in January 2014, when MNRE had previously published

Solar – India adds 453 MW in Q4 of FY 2013-14; Total addition in FY 2013-14 : 948 MW Read More »

India Solar – Gujarat continues to lead with ~40% of the total installations; Rajasthan gets 70% of the JNNSM Phase 1 projects

The MNRE released the state-wise solar installed capacity under JNNSM and various other schemes as of 31 January 2014. Not surprisingly, Gujarat continues to be the Number 1 state with 860.4 MW out of the total installed capacity of 2208 MW in the country. The most interesting part is that all this capacity came through

India Solar – Gujarat continues to lead with ~40% of the total installations; Rajasthan gets 70% of the JNNSM Phase 1 projects Read More »

India Wind – Gujarat leads in capacity addition in 2013-14, Maharashtra and Andhra Pradesh follow

According to the updates released by the Ministry of New and Renewable Energy, the total wind capacity in India stood at 20,226 MW. A total of 1,175 MW of wind capacity was added during the first 10 months of the FY 2013-14 till January 2014. Gujarat added 362 MW, followed by Maharashtra with 297 MW

India Wind – Gujarat leads in capacity addition in 2013-14, Maharashtra and Andhra Pradesh follow Read More »